A server room you can learn by running.
The decisions are yours. The simulation makes their consequences visible. Here is what the numbers mean.
Remote Hands is a fictional game in active development. It is not an engineering calculator or a model of a particular facility. Equipment capacities, temperatures, prices and time are simplified for play.
Three ways to play
The tutorial teaches the controls and first jobs. The main game lets you keep building without a time limit. Endless Shifts gives you 3-minute rounds with preparation time between them. Each has its own browser save.
What changes when you install equipment
Working servers draw power, produce heat and complete jobs. Coolers use electricity and share their cooling capacity among nearby racks. Heat slows work and can shut equipment down. Power and network limits constrain what you can install or finish.
The current temperature scale is a gameplay measure. It does not distinguish room inlet temperature from component temperature. Four server slots represent a simplified rack, not a physical rack-unit specification.
Cooling in Endless Shifts
Choose how installed cooling equipment rejects heat. These coefficients are illustrative design values. They make the trade-offs visible; they are not specifications for real products.
| Approach | Cooling electricity | Cooling capacity | On-site consumption | One-time retrofit |
|---|---|---|---|---|
| Dry cooling | 1× | 1× | 0 L per IT kWh | $0 |
| Evaporative cooling | 0.65× | 1× | 1 L per IT kWh | $700 |
| Liquid loop + dry cooler | 0.8× | 1.4× | 0 L per IT kWh | $2400 |
Multipliers apply to the existing cooler. You still need to buy, place and connect one. A liquid loop moves heat within the facility; the dry cooler rejects it outside. Zero here means no ongoing evaporation counted by this model, not zero water throughout the equipment lifecycle.
Energy and water accounting
One active simulation second represents 1 modeled minute for resource accounting. Energy is actual electrical draw multiplied by modeled hours. Water consumption is the selected cooling coefficient multiplied by IT energy while connected cooling is operating. The report counts consumption, not water withdrawal.
Evaporative water costs $0.5 per modeled litre in game money. This is a balance setting, not a utility tariff. Initial fill, leaks, upstream electricity water, embodied emissions and construction impacts are not counted yet. We do not present missing values as measured zeros.
During a water restriction, the allowance is 20 litres plus 5 litres per difficulty step, capped at step 10. Once used, evaporative cooling falls back to 0.7× cooling capacity and 1.2× electricity draw until the shift ends. This fallback is a simplified operating rule.
Shifts, costs and recovery
Preparation stops the clock and bills. Your crew rests; you can install equipment yourself. Menus pause Endless Shifts. The scheduled job starts with the shift. Optional jobs use the same equipment, and unfinished work closes without payment at settlement.
A completed job earns its payment. Completing at least one job while remaining solvent earns a $300 bonus plus $60 per shift, capped at shift 20. The report includes operating costs, water and total net cash change. Buying or selling equipment during a shift also changes that net figure.
Negative cash starts the existing 90-second recovery window. Sell individual equipment, finish paying work, or reduce costs. Between shifts, servicing the room costs $150 plus repairs and restores cooled, working racks. It does not reconnect equipment.
Early rewards and optional work
The first scheduled job needs 60 work and pays $600 before existing bonuses. Two starting servers complete it in about 30 active seconds if they stay healthy. Six opening shifts introduce capacity, cooling, scheduling, prices, service recovery and a combined challenge. After them, scheduled jobs use the bounded workload curve.
Adding a third working powered server, connecting a cooler beside a powered rack, and upgrading the power feed each earn $150 once per run. Goals are checked during active shifts. These equipment bonuses are separate from contract revenue.
A rush offer appears 35 seconds into each shift and closes at 110 seconds. It needs 80 work (160 in the third authored shift), pays $1000 before normal bonuses, and has a 60-second deadline after acceptance. It shares your compute; normal late-payment rules apply. Declining has no penalty. Already-running older saves receive these additions at their next shift.
Difficulty with limits
The first shift is quiet. The next five announce specific decisions and a planned server-service exercise. Beyond those opening shifts, challenges rotate warm weather, price peaks, water restrictions and a backup drill. Challenges are announced before you begin. Scheduled workload rises through the first 10 shifts and then stays bounded while events rotate. This first version does not yet provide unlimited distinct scenarios.
Service tickets and learning
Optional service tickets ask you to inspect a failed server or a rack missing power or nearby connected cooling. Repair or replace the hardware, or fix its connections, on the floor. A ticket pays $350 after 5 consecutive active seconds with the required healthy equipment. Removing server capacity is not a repair. No generic completion button grants a reward. One ticket can pay per shift; unfinished tickets close without a penalty.
Real service work follows equipment-specific procedures, authorization, safe isolation and verification. The game abstracts those steps and is not an electrical-work guide. Real thermal management distinguishes inlet air from component temperature and controls the path of hot exhaust. This version uses neighboring tiles and a combined rack temperature instead.
Room to grow
From shift 8, the Endless expansion allowance reduces the back-floor lease by $5000. It applies once through the normal purchase price, never as repeatable cash. The compact city site still has no extra floor. Power, cooling and hardware remain separate purchases. The proposed first-session target is 30–45 minutes including preparation; actual novice pacing still needs playtesting.
The voices and the fiction
The dispatcher helps with operations. Core and Enforcer belong to the optional story in the main game. Their story events do not run during the tutorial or Endless Shifts. Voice and effects have separate settings; captions communicate spoken lines.
Independent and evolving
Remote Hands is an independent game. It takes no political position. Future systems will be added through playable updates, with their assumptions explained here. Your current saves are protected when rules change.
Generated from ruleset endless-v1, catalog revision 1. Updated November 28, 2026.